Using Cucumber to estimate a project

Friday, May 15th, 2009

InvoiceWriting estimates up-front is a really tricky part of client work.

From the customer’s point of view it’s pretty essential. You need to know how much you are spending before the work begins so you don’t get stung.

From the developer’s point of view it’s pretty difficult to do because you don’t know how long things will take until you know what you’re building. And you don’t know the details of what you are building until they become apparent, which is normally while you are doing the work.

For this particular client I wanted to get this piece of work out of the way as quickly as possible and the requirements were deceptively complicated. As trying to deal with intangibles is a recipe for disaster, and time was short, I was pretty sure that whatever estimate I came up with would be totally inaccurate.

So to deal with the intangibles I thought I may as well get stuck in with the actual work. And what’s the first thing that I do? Write a cucumber story.

I went through the requirements documents (which after weeks of to and fro were actually quite detailed and refined) and broke it down into four features, each with a number of scenarios. Each scenario was then broken down into individual steps – however, I did not write any step definition (ruby) files. This is cucumber as customer documentation, not as integration testing.

We agreed that the features met the requirements (the client was very impressed with the level of detail and the clarity that cucumber offered) and I simply went through each feature, scenario and step and came up with a price for the step individually. It’s still guesswork, but it’s guesswork on a small scale, so you’re less likely to be way off. Total the lot and there’s your estimate.

And even better, once the client has agreed the price and you’ve started development, you’ve got a development plan, a measure of progress and proof that it all works – all just a simple rake features away.